From First Call to Scope and Budget in Five Days

 


 

“I’ve worked with Alliant on a wide range of projects, and they always come through with a great design and quality plans. On several projects there have been large changes at the last minute and Alliant has been able to navigate those changes quickly. I trust Alliant to deliver anything I throw at them.”

FORREST HASTY 
MnDOT District 7

 


 

TH 14 Hydraulics and Design Support – D7

  • Originally GEC work order for hydraulics support
  • Funding requirements caused redesign and District needed additional support to meet the schedule
  • In each instance, Alliant answered the call and provided the staff to get the project let on schedule

Federal Grant Applications – D3

  • GEC work order to prepare three Rural Grant applications and a combined INFRA/Mega Grant application
  • Scope and budget developed for the GEC work order two days later and got to work
  • Four highly visual applications were prepared under a tight six-week timeframe and strict requirements

Twin Ports Interchange Design – D1

  • Preliminary design through GEC work order; Member of CMGC team for detailed design and traffic control; 3D design with dozens of alternatives
  • Maintains traffic through project area over active rail yard
  • Last minute repackaging into multiple projects due to funding constraints